Cost To Fill In Ground Pool With Dirt

Use the excavator to transfer dirt into the hole by pushing it or picking it up with the bucket.
Cost to fill in ground pool with dirt. Contact a local swimming pool builder for guidance on the rules that apply to you. Small pools with easy access run about 10 000 15 000. See typical tasks and time to remove a pool along with per unit costs and material requirements. Cost to fill in a pool with dirt the average cost to fill in a swimming pool with dirt is 1 000 to 6 000 including delivery labor compacted fill dirt and topsoil.
Structural fill dirt costs 10 to 30 per cubic yard depending on the amount needed. Tailings are small stones that are a byproduct of our topsoil screening process. Consider covering the pool with dirt and laying down a lawn. Finally it is time for the fill dirt.
Filling in with dirt. See professionally prepared estimates for pool removal and backfilling work. As the dirt reaches the top of the pool drive over the layers with the excavator to pack it in which helps prevent settling. Get enough so that the top 20 of the ground is topsoil.
Based on pool that s 6 deep. This covers the cost of labor but there may be additional charges for soil. Filling in your pool averages 12 per cubic yard. Unless you have a jackhammer and experience using one you ll need to hire a contractor to break up your pool and level the rim.
The average price to fill in an inground swimming pool commonly referred to as a partial pool removal falls between 3 500 and 5 000. Learn more about what this cost includes how the fill in is done and more. Get fair costs for your specific project requirements. Expect to pay thousands for the dirt fill unless you have a cheap or free source already lined up.
If your pool is 20 feet long by 15 feet wide with a maximum depth of 6 feet you could be looking at roughly 60 to 100 per cubic yard. In addition to fill dirt you will also need topsoil so you can plant grass a garden or a tree where the pool once was. A good rule of thumb is ordering 80 fill tailings and 20 topsoil for the surface. Our fill is 12 00 per cubic yard.
Regular fill dirt is preferred but tailings are also an option. Local demolition rules may impact how much it costs to remove a pool and what you can use for fill. The cost to remove a pool starts at 114 141 per cubic yard but can vary significantly with site conditions and options. Get enough so that the top 20 of the ground is topsoil.