Cord Drawn Curtain Tracks Instructions

If unable to locate a timber stud use a suitable wall plug or toggle for hollow walls to hold your bracket.
Cord drawn curtain tracks instructions. Curtain track features and how to install. Add those two. Measure also the distance from the floor to the top of the curtain rod. Re attach track onto brackets and re hang curtains.
Replace sliders at each end. Installing your styletrack curtain track. To drill holes identify where the holes should be positioned and mark the track. Pass the cord over the central bridge on slave master slide f twist cord to create a loop and hook over centre tab f pass cord over the top of the bottom pulley in opposite end pulley.
Tension cord and tie off h. Most curtain tracks do not have the mounting holes pre drilled. Measure the rod s length while it is still on the wall. How to fit new cord to curtain tracks take measurements.
Remove the curtains from the traverse rods so you can access the cording. Place pulley 2 onto track section and secure with screws. If you re removing an old cord you can untie it. First you ll want to remove the curtain along with the curtain hooks from the rod and carriers.
I have fitted a metal white curtain track with cord attachments and runners but finding it very difficult to correctly hang the curtains problem overlaper runner hope you can help pulling my hair out thanks. Fitting instructions for styletrack track if installing into plaster or wallboard where possible try and pick up a timber stud. Click here for how to mend it. Once you have worked out were your track is going to go.
2 pull track apart at the centre. Standard drill bits work fine on all aluminum tracks. Hook cord over the lug on carrier 2 to secure it. 8conversion to one way draw right hand conversion drapes drawn from left to right 1 lay track face down on the floor.
Cord on overlap master carrier as original. How to thread cord on curtain rails. Using a small bit drill pilot holes centered in the slot through the top of the track. Then remove master carrier from the track.
Then feed cord around and over the top pulley g pass cord back through ovelrap master slide. Next place the rod face down on a flat surface. Draw the cord until the right hand carrier 1 is as far to the right as possible.